Home / Structural Components / Capital Metal Supply, Inc.
FL20148: Capital Metal Supply, Inc., Structural Wall
2026 code statusPending
FL20148-R5 is on file under the 2026 code with status “Pending FBC Approval”. Not approved for 2026 yet.
Last checked against floridabuilding.org: Oct 19, 2026, 11:30 AM ET. See the state record.
Filing record
- 2026 application
- FL20148-R5, Pending FBC Approval (Revision) · state record
- 2023 code approval
- FL20148-R4, Approved · state record
- Submitted
- Oct 2, 2026
- Validated
- Oct 3, 2026
- Pending FBC approval
- Oct 9, 2026
- Approved for HVHZ
- No
- Impact resistant
- No
- Compliance method
- Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer
- Quality assurance
- Farabaugh Engineering and Testing, LLC
- Validated by
- Steven M. Urich, PE
Products under this number (2)
| # | Model / description | HVHZ | Impact |
|---|---|---|---|
| 20148.1 | 26 Ga. Capital PBR Wall Panel 26 Ga. Capital PBR Wall Panel over Open Framing | No | No |
| 20148.2 | 29 Ga. Capital Rib Wall Panel 29 Ga. Capital Rib Wall Panel over open framing | No | No |
Verify FL20148 on floridabuilding.org before you rely on it for a permit. Spot an error? info@flapprovalwatch.com
Other Capital Metal Supply, Inc. numbers
Get the weekly list
New Florida approvals and filings, once a week. Unsubscribe any time.